layer-groupResource Pools

Fair GPU and compute sharing for AI/ML teams: dependable production capacity, shared pools, idle reuse, and workspace-level quotas.

circle-info

Resource pools are part of ZenML's paid features. For availability and plans, see the pricing pagearrow-up-right.

circle-info

Resource pools are only available for dynamic pipelinesarrow-up-right.

If you run AI or ML work in a shared environment, you have probably seen the same problems: jobs fighting over GPUs, surprise slowdowns when another team launches a big run, or expensive hardware sitting idle while someone waits in a queue. Resource pools are ZenML Pro’s answer. They are aimed at platform and team leaders who need clear rules, and at practitioners who just want their steps to get the right compute without babysitting the cluster.

Here are typical situations this feature is built for:

“Our production jobs must finish—no surprises.” You have training, fine-tuning, or inference that cannot vanish because someone else submitted a heavier workload. You want a clear agreement: this stack or this team gets a dependable slice of capacity, and critical steps are not stopped to make room for ad hoc work.

“We share one pool of GPUs across many teams.” You need one place that describes how much capacity exists, who may use it, and what happens when everyone wants it at once—without maintaining a separate spreadsheet or manual booking process for every pipeline.

“We paid for the hardware—we should use it when it’s free.” When one group is quiet, you want other teams to use spare capacity so machines do not sit empty. You also want the original team to get their capacity back when they return, without a long negotiation or a cluster reconfiguration every time.

“Engineers describe needs; ops maps them to reality.” Pipeline authors say what each step requires (GPUs, memory, and so on). Platform or DevOps ties those stacks to the right shared capacity. The same pipeline code can run in different environment or stages without hard-coding cluster details.

“We need to ration more than just GPUs.” Alongside standard compute, you may need to track things like licenses, special hardware, or how many pipeline steps may run at once. Pools let you treat those as countable resources under the same workspace-level model, as long as your organization agrees on names and units.

None of this replaces your orchestrator or cloud provider—it coordinates demand so teams see fair queuing, optional sharing of idle capacity, and explicit rules for critical versus best-effort work. When you are ready for how ZenML models that behavior, continue with Introduction to capacity management and Core concepts.

Introduction to capacity management

ZenML Pro resource pooling separates three concerns: what capacity exists, what each pipeline step asks for, and which stack components may draw from which pools under which rules. The subsections below describe the strategy; Core concepts then defines terms and mechanics precisely.

Supply: resource pools

On one side, resource pools describe resources that are available and consumable when pipeline steps run. They often include standard compute—GPUs, CPUs, and RAM—that orchestrators understand and that map to real infrastructure, but pools are not limited to that. Teams can define custom resource keys as a convention between whoever operates the platform and whoever writes pipelines: capabilities, access to external services or tools, licenses, or any other scarce thing you want to schedule in integer units. The same resource key names must appear in pool capacity and in step requests for the convention to work. This is the contract between the platform and the users.

The number of parallel step runs is also modeled as a resource today so concurrency can be capped alongside GPU or CPU demand. A pool can hold multiple resource types at once (for example GPUs and a step_run slot).

Who defines pools: the role that owns infrastructure access—IT ops, platform engineering, DevOps, or similar — defines and maintains resource pools at workspace scope so every team in that workspace shares the same catalog of named capacity.

Demand: ResourceSettings on steps

On the other side, pipeline steps declare what they need through ResourceSettings. That is typically the ML engineer, AI engineer, or data engineer annotating each step with GPUs, CPUs, memory, and optionally the same custom keys the admins put in pools. Authors can align requests with published pool capacity and follow whatever naming convention the platform agreed on for non-standard resources.

Steps also declare whether or not they are preemptible. Preemption is the ability to interrupt a running step run before it completes, to free up resources for other steps demanding them with a higher priority. Steps that are preemptible are not guaranteed to complete if they go outside of their reserved capacity. They may be interrupted, re-added to the queue and restarted again later, or even cancelled if they are not configured to allow retries.

That is the product-level tradeoff: preemptible steps may access more of the pool — including capacity that others are not using right now — but another workload can force them off the machine if priorities and policies require it, so they can fail early when contention is high. Non-preemptible steps opt into a smaller, dependable slice: they only consume what resources are reserved for them, so they are not evicted for pool reasons, at the cost of not using the “burst” capacity above that reservation.

Subject policies connect pools to execution. A policy binds a workload bearing stack component — today an orchestrator or step operator — to a pool and states what subset of that pool’s resources that component may use. Steps stay decoupled from a specific pool name: resolution uses the component in the active stack, so the same step definition can behave differently in different environments without code changes.

Policies are usually owned by the same platform or admin function, but ML teams can share ownership where it makes sense. Each policy carries priority, reserved amounts per key, and optionally limits:

  • Reservation answers “what pool share is accounted exclusively to this component” and is the only capacity that non-preemptible steps may rely on: they cannot use the gap between reserved and limit.

  • Limits (and the pool’s own maximum) bound how many resources preemptible work can take when spare capacity exists; without a limit, the effective ceiling is what the pool still has free. A higher limit does not raise the ceiling for non-preemptible requests; you need to raise reserved if those jobs need more per step.

When thinking about subject policies, it's helpful to understand that multiple steps in the same run or even in different runs will share the resources defined in the same subject policy if they run on the same stack component. So they will compete for the same reserved resources. If they go outside of their reserved capacity, they will also compete with other stack components that access the same pool.

Together, pools plus policies plus step annotations implement a shared, prioritized, optionally elastic scheduling story: strict guarantees where needed, elastic sharing where teams accept preemption risk.

What this looks like: three surfaces

1 — Pool (supply). Platform ops create a workspace pool, name it whatever helps the org (say datacenter-one), and record how much of each scarce thing exists there: 10 GPUs, 200 CPUs and 500 GB of memory. That number is the shared ceiling everyone draws from.

2 — Policy (wiring a stack to a pool). They attach a subject policy so a specific stack component knows which pool to use and what slice it may claim. If your pipeline runs on a stack called prod-stack, its orchestrator (or step operator) is the component named in the policy: “prod-stack’s orchestrator may pull from datacenter-one, with this much reserved and this much limit,” and a priority versus other stacks.

3 — Step request (what the run asks for). The data scientist opens a step and says, in effect, “this step needs three GPUs, 1 CPU and 2 GB of memory” and can be preempted.

When they launch a dynamic run on prod-stack, ZenML turns that into a resource request: three GPUs, matched against datacenter-one through prod-stack’s policy. If three are free, the step proceeds; if not, it waits in line; if the ask breaks the rules (too many GPUs, non-preemptible without reservation), it fails fast with a clear status. Run and step views show queued / allocated / rejected so operators can compare ZenML to the real cluster.

The subsections explain how queues, borrowing, and preemption implement that model in ZenML Pro.